Automatic Power Factor Correction Using Fuzzy Inference System And Internet Of Things

Main Article Content

Jamaaluddin Jamaaluddin
Izza Anshory
Sayid
Fudholi

Abstract

There are 3 types of electrical loads: inductive, capacitive and resistive. Most of what happens in the use of electricity is inductive load. This inductive load arises because many electricity consumers utilize loads that use coils. The excessive inductive load will cause the appearance of a low power factor value. A good power factor value is 0.85-1. This research aims to improve the low power factor value, the use of capacitors installed parallel to the load can compensate for reactive power and increase the power factor value. How much capacitor value should be installed to obtain a good power factor. There are 2 kinds of calculations carried out, namely without using a Fuzzy Inference System and using a Fuzzy Inference System. The calculation results are compared with the measurement values. Then, the Mean Absolute Error value obtained if without using the Fuzzy Inference System is 8.500% and if using the Fuzzy Inference System has a Mean Absolute Error value of 4.060%. Therefore, the capacitor value calculation system using the Fuzzy Inference System can be proposed to be applied to the use of an automatic system to increase the power factor value.

Article Details

How to Cite
Jamaaluddin, J., Anshory, I., Galih R, S., & Fudholi, A. (2025). Automatic Power Factor Correction Using Fuzzy Inference System And Internet Of Things. Journal FORTEI-JEERI, 6(1), 20-35. https://doi.org/10.46962/forteijeeri.v6i1.28
Section
Power System
Author Biography

Jamaaluddin Jamaaluddin, a:1:{s:5:"en_US";s:33:"Universitas Muhammadiyah Sidoarjo";}

sinta : https://sinta.kemdikbud.go.id/authors/profile/5990966
Scopus : https://www.scopus.com/authid/detail.uri?authorId=57218105515
Orcid : https://orcid.org/0000-0002-8728-5111

References

J. Jamaaluddin and I. Robandi, “Very Short Term Load Forecasting Using Hybrid Regression and Interval Type -1 Fuzzy Inference,” IOP Conf. Ser. Mater. Sci. Eng., vol. 434, no. 1, p. 012209, Dec. 2018, doi: 10.1088/1757-899X/434/1/012209.

Jamaaluddin, I. Robandi, and I. Anshory, “A very short-term load forecasting in time of peak loads using interval type-2 fuzzy inference system: A case study on java bali electrical system,” J. Eng. Sci. Technol., vol. 14, no. 1, pp. 464–478, 2019, [Online]. Available: http://jestec.taylors.edu.my/Vol 14 issue 1 February 2019/14_1_31.pdf

J. Jamaaluddin, I. Robandi, I. Anshory, and A. Fudholi, “Very Short-Term Load Forecasting Of Peak Load Time Using Fuzzy Type-2 And Big Bang Big Crunch (Bbbc) Algorithm,” ARPN J. Eng. Appl. Sci., vol. 15, no. 7, pp. 854–861, 2020.

S. Halim, “Revolusi Industri 4.o di Indonesia,” Interciencia, 2018.

S. Herman Nawir, Muhammad Ruswandi Djalal, “Analisa Keandalan Sistem Kelistrikan Jawa Bali,” J. Electr. Electron. Eng. UMSIDA, vol. 1, no. 1, pp. 1–6, 2014, [Online]. Available: http://ojs.umsida.ac.id/index.php/jeee-u/article/view/1581

M. Korchak, O. Sivakova, and Y. Fediv, “Virtual Source of Reactive Power in Electricity Supply Systems of Household Consumers,” Energy Eng. Control Syst., vol. 5, no. 1, pp. 9–14, 2019, doi: 10.23939/jeecs2019.01.009.

B. Vyas, M. K. Gupta, and M. P. Sharma, “Distributed Volt Ampere Reactive Power Compensation of Modern Power System to Control High Voltage,” J. Inst. Eng. Ser. B, vol. 101, no. 1, pp. 93–100, 2020, doi: 10.1007/s40031-020-00422-3.

S. Saodah, I. M. W. Kastawan, E. Yusuf, B. P. Manunggal, and M. Maryanti, “Simulation of Effects of Using Capacitor for Reactive Power (VAR) Compensation on Electrical Power Supply Quality,” Proc. 5th FIRST T1 T2 2021 Int. Conf. (FIRST-T1-T2 2021), vol. 9, pp. 168–174, 2022, doi: 10.2991/ahe.k.220205.029.

Lisiani, A. Razikin, and Syaifurrahman, “Identifikasi dan Analisis Jenis Beban Listrik Rumah Tangga Terhadap Faktor Daya ( Cos Phi ),” J. Untan, vol. 1, no. 3, pp. 1–9, 2020.

Kementerian ESDM, “Rencana Usaha Penyediaan Tenaga Listrik ( RUPTL ) PLN,” Ruptl, vol. 1, no. 1, pp. 1–58, 2019.

M. L. Fotia and J. F. Driscoll, “Isolator-Combustor Interactions in a Direct-Connect Ramjet-Scramjet Experiment,” J. Propuls. Power, vol. 28, no. 1, pp. 83–95, 2012, doi: 10.2514/1.B34367.

L. Suganthi, S. Iniyan, and A. A. Samuel, “Applications of fuzzy logic in renewable energy systems - A review,” Renew. Sustain. Energy Rev., vol. 48, pp. 585–607, 2015, doi: 10.1016/j.rser.2015.04.037.

A. J. Watkins, “Power factor improvement,” Electrical Installation Calculations: Advanced. pp. 70–75, 2020. doi: 10.4324/9780080953946-12.

I. A. Bhatia, “Power Factor in Electrical,” vol. 144, 2012.

N. M. Karmiathi and I. K. A. Putra, “Technical analysis of power factor improvement using ETAP 12.6 at Regent Resort & Holiday Inn Canggu,” Matrix J. Manaj. Teknol. dan Inform., vol. 12, no. 1, pp. 38–50, 2022, doi: 10.31940/matrix.v12i1.38-50.

O. Noureldeen and I. Hamdan, “Design of robust intelligent protection technique for large-scale grid-connected wind farm,” Prot. Control Mod. Power Syst., vol. 3, no. 1, 2018, doi: 10.1186/s41601-018-0090-4.

S. Hardi, M. Rahmat, and E. P. Sinulingga, “Improved Quality of using Voltage Static Var Compensator and Capacitor Bank on the Transmission Line,” J. Phys. Conf. Ser., 2021, doi: 10.1088/1742-6596/1811/1/012066.

G. . A. S. .S, “Automatic Reactive Power Flow Control in 100MW Turbo Generator,” Int. J. Sci. Res., vol. 4, no. 4, pp. 2151–2154, 2015, [Online]. Available: https://www.ijsr.net/archive/v4i4/SUB153547.pdf

J. Jamaaluddin, D. Hadidjaja, I. Sulistiyowati, E. A. Suprayitno, I. Anshory, and S. Syahrorini, “Very short term load forecasting peak load time using fuzzy logic,” 2018. doi: 10.1088/1757-899X/403/1/012070.

N. H. L. Dewi, M. F. Rohmah, and S. Zahara, “Prototype Smart Home Dengan Modul Nodemcu Esp8266 Berbasis Internet of Things (Iot),” J. Tek. Inform., p. 3, 2019.

A. Deris, “Sistem Informasi Darurat Pada Mini Market Menggunakan Mikrokontroler Esp8266 Berbasis Internet of Things,” Komputasi J. Ilm. Ilmu Komput. dan Mat., vol. 16, no. 2, pp. 283–288, 2019, doi: 10.33751/komputasi.v16i2.1622.

A. Adriansyah and R. zally Priatmadja, “Rancang bangun protocol modbus pada kwh meter elektronik tipe ion 8600 untuk memonitor besaran energi listrik trafo dengan menggunakan aplikasi citect scada,” J. Teknol. Elektro, 2015, doi: 10.22441/jte.v6i1.789.

and B. H. P. A. Kurniawan, D. Syauqy, “Pengembangan Monitoring Listrik Pada Ruangan Menggunakan Nodem CU dan MQTT,” 2017.

F. Mohamad, N. H. Abdullah, N. K. Kamaruddin, and M. Mohammad, “Implementation of ISO50001 energy management system,” ISTMET 2014 - 1st Int. Symp. Technol. Manag. Emerg. Technol. Proc., no. Istmet, pp. 275–280, 2014, doi: 10.1109/ISTMET.2014.6936518.

M. Rumbayan, A. Abudureyimu, and K. Nagasaka, “Mapping of solar energy potential in Indonesia using artificial neural network and geographical information system,” Renew. Sustain. Energy Rev., vol. 16, no. 3, pp. 1437–1449, 2012, doi: 10.1016/j.rser.2011.11.024.

Y. M. Djaksana, “Perancangan Sistem Monitoring Dan Kontroling,” vol. 2, no. 3, pp. 13–24, 2020.

S. Bhattacharyya, A. Choudhury, and P. H. R. Jariwala, “Case Study On Power Factor Improvement,” Int. J. Eng. Sci. Technol., vol. 3, no. 12, pp. 8372–8378, 2011.

M. N. Zaidi and A. Ali, “Power Factor Improvement Using Automatic Power Factor Compensation (APFC) Device for Medical Industries in Malaysia,” MATEC Web Conf., vol. 150, 2018, doi: 10.1051/matecconf/201815001004.

D. C. K. P. Lopamudra Mitra, “Power Factor Improvement Using Active,” J. Electr. Eng. Technol., vol. 1, no. 11, pp. 32–46, 2010.

A. Aye Mon and S. W. Naing, “Power Factor Improvement for Industrial Load by using Shunt Capacitor Bank,” vol. 03, no. 15, pp. 3191–3195, 2014, [Online]. Available: www.semargroup.org,www.ijsetr.com

M. Y. Rofandy and A. Hasibuan, “Analysis of the Effect of Bank Capactor Placement As,” vol. 02, no. 01, 2022.

E. CLARKE and S. B. CRARY, “Stability Limitations of Long-Distance A-C Power-Transmission Systems,” Trans. Am. Inst. Electr. Eng., vol. 60, no. 12, pp. 1051–1059, 1941, doi: 10.1109/T-AIEE.1941.5058233.

E. Osman, M. Ahmed, S. A. S. Ibrahim, and H. Qahtan, “Reducing Losses in the Sudanese Power Transmission System 66 kV Sector,” vol. 10, pp. 1–13, 2023, doi: 10.4236/oalib.1109666.

J. Aparicio, J. Rosca, M. Mediger, A. Essl, K. Arzig, and S. Ag, “Exploiting Road Traffic Data for Very Short Term Load Forecasting in Smart Grids,” Innov. Smart Grid Technol. Conf., pp. 1–5, 2014, doi: 10.1109/ISGT.2014.6816498.

Y. Loewenstern, L. Katzir, and D. Shmilovitz, “The effect of system characteristics on very-short-term load forecasting,” 12th Conf. Int. Sch. Nonsinusoidal Curr. Compens. ISNCC 2015 - Conf. Proc., 2015, doi: 10.1109/ISNCC.2015.7174690.

P. Q. P. Qingle and Z. M. Z. Min, “Very Short-Term Load Forecasting Based on Neural Network and Rough Set,” Intell. Comput. Technol. Autom. (ICICTA), 2010 Int. Conf., vol. 3, pp. 1132–1135, 2010, doi: 10.1109/ICICTA.2010.38.

Q. Liang and J. M. Mendel, “Interval type-2 fuzzy logic systems: Theory and design,” IEEE Trans. Fuzzy Syst., vol. 8, no. 5, pp. 535–550, 2000, doi: 10.1109/91.873577.

J. M. Mendel, R. I. John, and F. Liu, “Interval Type-2 Fuzzy Logic Systems Made Simple,” Fuzzy Syst. IEEE Trans., vol. 14, no. 6, pp. 808–821, 2006, doi: 10.1109/TFUZZ.2006.879986.

S. Hassan, A. Khosravi, J. Jaafar, and M. A. Khanesar, “A systematic design of interval type-2 fuzzy logic system using extreme learning machine for electricity load demand forecasting,” Int. J. Electr. Power Energy Syst., 2016, doi: 10.1016/j.ijepes.2016.03.001.

O. Castillo and P. Melin, “A review on interval type-2 fuzzy logic applications in intelligent control,” Inf. Sci. (Ny)., 2014, doi: 10.1016/j.ins.2014.04.015.

L. A. Zadeh, “Fuzzy Logic,” Computer (Long. Beach. Calif)., vol. 21, no. 4, pp. 83–93, 1988, doi: 10.1109/2.53.

O. Castillo, “Interval type-2 fuzzy logic for hybrid intelligent control,” Studies in Fuzziness and Soft Computing. 2013. doi: 10.1007/978-3-642-35641-4-14..